• Welcome to CayenneEVforum! If you're joining us from Taycanforum, you may already have an account here.

    If you were registered on Taycanforum as of August 27, 2025 or earlier, you can simply login here with the same username and password

    If you wish, you can remove your account here.

ETA for a build slot

dba

Member
First Name
Gorjan
Joined
Jun 15, 2024
Threads
3
Messages
8
Reaction score
2
Location
Macedonia
Vehicles
Range Rover Sport
Country flag
Hi all,

I put down my deposit about a month ago and still haven’t got a build slot. It’s for a Turbo (21” wheels, so those shouldn’t be causing the delay).

The dealer warned me there’s supposedly high demand for the Turbo and that it’ll be hard to get a build slot quickly.

What’s the expected ETA for a build slot these days?

Cheers!
 

Wivenhoe

Well-Known Member
Joined
Feb 27, 2025
Threads
3
Messages
49
Reaction score
4
Location
UK
Vehicles
Macan 4S (EV)
Country flag
As the electric is being built on the same line as the ICE then slot allocation will be a bit of a lottery. If the ICE models are more popular than the EV then logically they will allocate them more and quicker slots.
 
OP
OP
dba

dba

Member
First Name
Gorjan
Joined
Jun 15, 2024
Threads
3
Messages
8
Reaction score
2
Location
Macedonia
Vehicles
Range Rover Sport
Country flag
But next year? That seems unreasonable… :confused:
 

Fun TC Driving

Well-Known Member
First Name
John
Joined
Aug 21, 2023
Threads
23
Messages
194
Reaction score
73
Location
Pacific Northwest
Vehicles
2024 Macan EV Turbo, 2023 C8 Z06
Country flag
Are talking next calendar year or next model year? I think it is the latter and 2027 new allocations could be literally starting months from now.
 

W1NGE

Well-Known Member
First Name
Adrian
Joined
Jan 11, 2021
Threads
42
Messages
3,906
Reaction score
138
Location
Aberdeen, Scotland
Vehicles
992.2, ex GTS ST owner, Macan T
Country flag
But next year? That seems unreasonable… :confused:
My dealership sold out all variant allocations 2 months ago.

Remember this is half way through the year effectively and so not a full year allocation is possible.

I am interested in a base Cayenne EV and was told the earliest delivery would now be April 2027.

Regional variations apply of course.
 

W1NGE

Well-Known Member
First Name
Adrian
Joined
Jan 11, 2021
Threads
42
Messages
3,906
Reaction score
138
Location
Aberdeen, Scotland
Vehicles
992.2, ex GTS ST owner, Macan T
Country flag
Are talking next calendar year or next model year? I think it is the latter and 2027 new allocations could be literally starting months from now.
Calendar. You can place a deposit but no delivery'until next year. Allocations are thin on the ground.
 
OP
OP
dba

dba

Member
First Name
Gorjan
Joined
Jun 15, 2024
Threads
3
Messages
8
Reaction score
2
Location
Macedonia
Vehicles
Range Rover Sport
Country flag
So this is due to the high demand of the EV and/or ICE, or a new model slower production ramp up? .. I would not mind slow delivery and long wait, if they take their time, making sure that quality assurance is good.
 
 
Top